| Phoebe Crisman | ||||||||||||||||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||
|
Project location: Holton Street Viaduct in Milwaukee
|
Section: Milwaukee River to Brady Street |
Plan of 3 interventions |
Proposed Bus stop @ Brady Street |
Infrastructure
Grove: incorporating
|
Viaduct + Rock Garden approach @ Water Street |
Proposed lighting of Viaduct underbelly |
Rock Garden plan |
Rock Garden beneath Viaduct |
Marsupial Bridge slung below the Viaduct |
|||||||||||||||